19
July
2021
|
09:43 AM
America/Los_Angeles
Elevators Will Be Offline While Teams Install New Signage
CSUSM Engineers will be on campus to apply new decals to all of the campus elevators. Throughout campus, elevators will be taken out of service for several minutes at a time to apply the stickers. In buildings with multiple elevators located throughout, there will always be an elevator available. For those elevators that only have 1 elevator (Arts and Science 1), we will work to complete the task as quickly as possible and return the elevator to full service.