16
September
2021
|
14:51 PM
America/Los_Angeles

Sixth Floor of Parking Structure 2 Will Be Closed Until June 2022

The sixth level of Parking Structure 2 next to the Extended Learning building will be shut down until June 2022 for the Block 3 construction project. The elevators in PS2 will not go to the sixth floor during the duration of this closure but will continue to operate to floors 1-5.